| 1. | In this article , analysis is made on some problems which must be faced when plasma ignition technology is applied in 600mw unit boiler to achieve a power plant without oil , such as plasma burner disposal , the number of plasma burner , the boiler ignition coursing satisfy the temperature needs , pulverized coal origin , hot air origin , and reconstruction solutions are proposed 本文详细分析了某厂2 600mw机组锅炉采用等离子点火技术实现无燃油电厂所面临的等离子燃烧器的布置、等离子燃烧器层数的选择、锅炉点火启动满足升温速度的要求、煤粉的来源、热风的来源等问题,并提出了相应的解决方案。 |